Project assignment at Philips Healthcare

The Information Systems group is often contacted by industrial organizations with assignments that could lead to student projects at various levels (master thesis project, bachelor completion project, etc.) Through this website we make these topics available to our students. In this post, we announce one such project, involving company Philips.

De opdracht: haalbaarheids studie of SAP workflow de mogelijkheden heeft om de onderstaande wensen te realiseren.

Indien SAP functionaliteit bruikbaar is voor opzetten van Engineering Change proces: het maken van project plan voor ontwikkeling en implementatie.

The intended use of workflow is to

1.       Track the status of the implementation of an Engineering Change Requests (ECR) in the supply chain;

2.       Manage the action plan for supply chain implementation for each functional area participating in the master data enrichment process.

3.       Generate reports / KPI’s with regard to implementation of Engineering Change Requests (ECR) in the supply chain

4.       Be  able to manage electronic signatures [electronic approval on ECR level and on action plan level for each functional area]. Then it will no longer be necessary to archive signed hardcopies of the implemented ECRs.

 

Contact for more information: Pieter Van Gorp